RETAIL CONSTRUCTION PROJECT IN NORTHAMPTON, NORTHAMPTONSHIRE FOR RG GROUP SAINSBURYS
Project Description
Weedon Road
Reconstruction of single storey structural steel car park deck, with existing foundations replaced, plus additional foundations for RG Group Ltd.
Start Date: June 2020
Completion date: September 2020
Value: £375K
Project Details
- 6800m2 composite car park deck replaced with RC deck
- Works phased to enable store to continue trading throughout
- Works phased to retain as much live car parking as possible throughout, at both ground and first floor level
- Temporary works support to existing structure
- 100% of existing foundations totally deconstructed to facilitate replacement with new pile/pile cap foundations
- Additional new structural steel columns installed on pile/pile cap foundations
- Original fatigued car park deck removed, and completely replaced with new RC deck, all laid to falls to receive asphalt surfacing
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
RG Group Sainsburys – Weedon Rd, Northampton, Northamptonshire
RG Group Sainsburys – Weedon Rd, Northampton, Northamptonshire