RETAIL CONSTRUCTION PROJECT IN BRACKLEY, NORTHAMPTONSHIRE FOR RG GROUP SAINSBURYS
Project Description
Construction of new build retail Sainsburys Supermarket for R G Group Ltd.
Start Date: May 2020
Completion date: Nov 2020
Value: £2.00M
Project Details
- Machine guided cut/fill earthworks
- Adoptable, offsite, storm sewer outfall
- Attenuation tanks and attenuation drainage
- Stormwater harvesting pumping station
- Foundations and bolts for structural steel frame
- RC retaining walls
- Internal drainage – Foul, syphonic and condensate
- 3300m2 RC internal floor slabs
- Power floated slabs to BoH
- Multiple service ducts and pits
- 1700m2 RC slab to service yard
- 8700m2 car park and access road
- External works
- S278 Highway improvement works
- High/Low level pedestrian access to Highway, comprising multiple flights to external RC staircase
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
RG Group - Sainsburys - Brackley, Northamptonshire