RETAIL CONSTRUCTION PROJECT IN AYLESBURY, BUCKINGHAMSHIRE FOR RG GROUP SAINSBURYS
Project Description
Development of brownfield site into new Sainsburys Supermarket for RG Group Ltd. Construction of a new Petrol Filling Station and associated highway improvements.Start Date: January 2021
Completion date: Ongoing
Value: £2.56M
Project Details
- Earthworks to service yard
- Pile caps, foundations and bolts for structural steel frame
- RC piled foundation for sprinkler tank
- RC retaining walls to store, service yard and boundary
- RC capping beam to sheet piles
- Internal drainage – foul, syphonic and condensate
- Cut/Fill, Type 1 and trim to 7700m2 internal floor slab
- Storm drainage to Thames Water outfall
- Attenuation tank
- Stormwater harvesting pumping station
- Service ducting and pits
- 1800m2 RC slab to service yard
- 1000m2 access road
- 10200m2 permeable block paved, and tarmac car park
- External works
- S278 Highway improvement works to PFS
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
RG Group - Sainsburys - Aylesbury, Buckinghamshire
RG Group - Sainsburys - Aylesbury, Buckinghamshire