Project Scope: 1st phase enabling package, 2nd phase full ground works package.

RESIDENTIAL CONSTRUCTION PROJECT IN THETFORD, NORFOLK FOR TILIA HOMES (EASTERN)

Project Description


  • Developer: Tilia Homes Eastern Ltd
  • Job Title: Kingsfleet Phase 1B
  • Project description: Residential development consisting of 130 no units
  • Start Date: August 2021
  • Completion Date: August 2023
  • Value: £5.60M
 

Project Scope: 1st phase enabling package, 2nd phase full ground works package.


AD Bly Scope of works: Phase 1 enabling package to include:


  • AD Bly acting as Principal Contractor for the enabling package.
  • Site set up, compound and welfare areas.
  • Site clearance & tree protection
  • Construction of a temporary S278 site Access & ingress from Norwich Road
  • Construction of S30 adoptable footpath along the High Street West


AD Bly Scope of works: Phase 2 full ground works package to include:


  • Earth Works
  • Roads & sewers
  • Excavation of balancing pond including downstream defender and associated headwalls and hydrobrakes.
  • Mains services
  • Haul road installation
  • Oversites completion: Foundations, drainage & services, substructure construction including face brickwork, block & beam floors, concrete floors, scaffold mats drives and walk ways.
  • External works: plot service connections, impermeable & permeable block paved areas, slabbing & topsoiling to all plots.
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Tilia Homes (Eastern) – Kingsfleet Phase 1B Thetford, Norfolk
Tilia Homes (Eastern) – Kingsfleet Phase 1B Thetford, Norfolk
Tilia Homes (Eastern) – Kingsfleet Phase 1B Thetford, Norfolk
Tilia Homes (Eastern) – Kingsfleet Phase 1B Thetford, Norfolk
 
Previous
Next
© Copyright AD Bly Construction 2024