RESIDENTIAL CONSTRUCTION PROJECT IN SHIPDHAM, NORFOLK FOR PLACES FOR PEOPLE
Project Description
Groundworks and infrastructure to 102 new dwellings
Client: Places for People
Start date: April 2025
Completion date: August 2027
Value: £6.7m
Project Details
- Principal Contractor responsibilities for initial phase of works
- Site cut and fill, site clearance and topsoil strip
- Identification and isolation of contamination and subsequent remediation
- Piling mats
- Trench fill foundations and insitu ground-beams
- Piling and attendances
- Substructure brick and blockwork
- Design, supply and install low U value flooring solution
- Private drainage
- S38 carriageway and footway
- S104 adoptable drainage
- Adoptable foul water pumping station, emergency storage and rising main
- Permeable driveways with fin and permeable piping. Multiple membranes employed in subbase
- Lined ponds with associated headwalls and flow controls
- Statutory and private services with new substation
- Paths, patios and shed bases
- Site logistics, safe routes and compound

DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us

Residential Construction Project in Shipdham, Norfolk for Places for People

Residential Construction Project in Shipdham, Norfolk for Places for People