![Residential development consisting of 81 dwellings Residential development consisting of 81 dwellings](/assets/6206900fb8a1c.jpg)
RESIDENTIAL CONSTRUCTION PROJECT IN BRAINTREE, ESSEX FOR CROUDACE HOMES
Project Description
- Developer: Croudace Homes
- Job Title: Silk Row, Pods Brook Road, Braintree, Essex
- Project description: Residential development consisting of 81 dwellings
- Start Date: September 2021
- Completion Date: March 2024
- Value: £4.00M
Project Scope: 1st phase Enabling and Piling package, 2nd phase full ground works package.
AD Bly Scope of works: Phase 1 enabling package to include:
- AD Bly acting as Principal Contractor for the enabling package for pile mats
- Site set up, compound and welfare areas.
- Installation of Croudace car park and compund
- Installation of pile mat for Van-Elle piling company
AD Bly Scope of works: Phase 2 full ground works package to include:
- Earth Works
- Enabling for CFA Piling
- Roads & sewers including petrol Interceptor, installing pump chamber and pond
- Mains services in multi trench
- Oversites completion: Foundations, drainage & services, substructure construction including face brickwork, block & beam floors, concrete floors, scaffold mats drives and walk ways.
- External works: plot service connections, impermeable & permeable block paved areas, slabbing & topsoiling to all plots.
- Section 278 works inclusive of offsite drainage
- Retaining and Screen wall foundations
![PDF Download](https://adbly.co.uk/images/download.png)
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
![Croudace Homes - Braintree, Essex](/assets/61fa9b6914f01.jpg)
Croudace Homes - Braintree, Essex
![Croudace Homes - Braintree, Essex](/assets/62067f9aa9928.jpg)
Croudace Homes - Braintree, Essex