AD Bly Scope of works: S.278 Works & Enabling works package, Inc soil nailed retaining wall and embankment construction.

INFRASTRUCTURE CONSTRUCTION PROJECT IN SAFFRON WALDEN, ESSEX FOR BELLWAY ESSEX

Project Description


Project Scope: AD Bly acting Principal Contractor for job duration.

Developer: Bellway Essex
Job Tile: Poppy View Saffron Walden
Start Date: March 2021
Completion Date: August 2021
Value: £1.6m
 

Project Details


AD Bly Scope of works: S.278 Works & Enabling works package, Inc soil nailed retaining wall and embankment construction.


  • S.278 Works: Widening of existing carriage way, construction of central islands, new signals and pedestrian crossing points, bellmouth construction, footpath realignment, road & path resurfacing works, white lining
  • Retaining Wall Construction: Soil nailed retaining wall with shotcrete finish
  • Spine Road Completion: Cut & fill earth works using site won chalk to form the spine road to Essex Highways adoptable standards. Deep FW & SW drainage, road construction completion including surfacing works
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Bellway Essex – Saffron Walden, Essex
Bellway Essex – Saffron Walden, Essex
Bellway Essex – Saffron Walden, Essex
Bellway Essex – Saffron Walden, Essex
 
Previous
Next
© Copyright AD Bly Construction 2024