INFRASTRUCTURE CONSTRUCTION PROJECT IN HODDESDON, HERTFORDSHIRE FOR TAYLOR WIMPEY
Project Description
Project Scope: Phase 1 New Residential development, full ground works package. Phase 2 infrastructure works with AD Bly acting as Principal Contractor for job duration.
Developer: Taylor Wimpey
Job Tile: High Leigh Garden Village
Project description: Residential development consisting of multiple phases.
Start Date: Oct 2020
Completion Date: Oct 2022
Value: £7.1M
Project Details
AD Bly Scope of works: Phase 1 full groundworks package to include:
- Site set up, compound and welfare areas
- GS6 HV Diversion works
- TPO Protection
- Cut & Fill works
- Roads & sewers
- Haul road installation for muck movement
- Oversites completion: Foundations, drainage & services, substructure construction including face brickwork, block & beam floors, concrete floors, scaffold mats drives and walk ways
- External works: plot service connections, block paving, slabbing & topsoiling to all plots
AD Bly Scope of works: Phase 2 infrastructure package to include:
- Site set up, compound & welfare areas along with perimeter fencing
- TPO Protection
- Cut & Fill works
- Roads & Sewers
- Culvert works
- Attenuation ponds
- Gravitas retaining wall systems
- Bridge works
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
Taylor Wimpey – Hoddesdon, Hertfordshire
Taylor Wimpey – Hoddesdon, Hertfordshire
Taylor Wimpey – Hoddesdon, Hertfordshire