INFRASTRUCTURE CONSTRUCTION PROJECT IN HODDESDON, HERTFORDSHIRE FOR TAYLOR WIMPEY

Project Description


Project Scope: Phase 1 New Residential development, full ground works package. Phase 2 infrastructure works with AD Bly acting as Principal Contractor for job duration.

Developer: Taylor Wimpey
Job Tile: High Leigh Garden Village
Project description: Residential development consisting of multiple phases.
Start Date: Oct 2020
Completion Date: Oct 2022
Value: £7.1M
 

Project Details


AD Bly Scope of works: Phase 1 full groundworks package to include:


  • Site set up, compound and welfare areas
  • GS6 HV Diversion works
  • TPO Protection
  • Cut & Fill works
  • Roads & sewers
  • Haul road installation for muck movement
  • Oversites completion: Foundations, drainage & services, substructure construction including face brickwork, block & beam floors, concrete floors, scaffold mats drives and walk ways
  • External works: plot service connections, block paving, slabbing & topsoiling to all plots


AD Bly Scope of works: Phase 2 infrastructure package to include:


  • Site set up, compound & welfare areas along with perimeter fencing
  • TPO Protection
  • Cut & Fill works
  • Roads & Sewers
  • Culvert works
  • Attenuation ponds
  • Gravitas retaining wall systems
  • Bridge works
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Taylor Wimpey – Hoddesdon, Hertfordshire
Taylor Wimpey – Hoddesdon, Hertfordshire
Taylor Wimpey – Hoddesdon, Hertfordshire
Taylor Wimpey – Hoddesdon, Hertfordshire
Taylor Wimpey – Hoddesdon, Hertfordshire
Taylor Wimpey – Hoddesdon, Hertfordshire
 
Previous
Next
© Copyright AD Bly Construction 2024