INFRASTRUCTURE CONSTRUCTION PROJECT AT SIZEWELL B AND C NUCLEAR POWER STATIONS FOR IMTECH LTD
Project Details
Client: Imtech / Dalkia
Start date: September 2022
Completion Date: November 2023
Value £1.8m
Project Description
Construction of a new access road within Sizewell B to facilitate release of land for the new Sizewell C nuclear power station.
- New loop access road constructed in a live operating nuclear power station (Sizewell B)
- Maintaining access to plant and car parks
- Alterations and regrading existing station car park
- Cut and fill and level changes
- Working within the vicinity of 400kv overhead power lines and live underground services
- Tie in works to existing carriageways
- Drainage and associated soakaways
- Spoil management within the project boundaries
- Pumping station and rising main
- Working adjacent to SSSI
- Street furniture and height restrictors
- Street lighting and ducting
- New kerbing and kerb alterations
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
Sizewell B and C Nuclear Power Stations
Sizewell B and C Nuclear Power Stations
Sizewell B and C Nuclear Power Stations
Sizewell B and C Nuclear Power Stations