COMMERCIAL CONSTRUCTION PROJECT IN STANFORD LE HOPE FOR GOLDBECK CONSTRUCTION LTD
Project Description
Construction of 13,000m2 / 140,000ft2 distribution unit
Client: Goldbeck Construction Ltd
Start date: January 2023
Completion Date: July 2023
Value £2.4m
Project Details
- 4m Deep drainage with a number of large diameter oil separators and rainwater harvesting tanks
- 16m Culvert waterway diversion
- Foul water treatment plant to process all on site foul water ready to discharge into local water course
- Precast pile solution with Pad foundations, reinforced lift pit bases and dock levellers
- 2000m2 power float suspended metal deck slab
- 1400nr reinforced flared mushroom pile caps supporting suspended ground floor slab
- 7500m2 of brushed finish concrete service yard slab
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
Commercial Construction Project in Stanford Le Hope for Goldbeck Construction Ltd
Commercial Construction Project in Stanford Le Hope for Goldbeck Construction Ltd