COMMERCIAL CONSTRUCTION PROJECT IN STANFORD LE HOPE FOR GOLDBECK CONSTRUCTION LTD
Project Description
Construction of 13,000m2 / 140,000ft2 distribution unit
Client: Goldbeck Construction Ltd
Start date: January 2023
Completion Date: July 2023
Value £2.4m
Project Details
- 4m Deep drainage with a number of large diameter oil separators and rainwater harvesting tanks
- 16m Culvert waterway diversion
- Foul water treatment plant to process all on site foul water ready to discharge into local water course
- Precast pile solution with Pad foundations, reinforced lift pit bases and dock levellers
- 2000m2 power float suspended metal deck slab
- 1400nr reinforced flared mushroom pile caps supporting suspended ground floor slab
- 7500m2 of brushed finish concrete service yard slab
![PDF Download](https://adbly.co.uk/images/download.png)
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
![Commercial Construction Project in Stanford Le Hope for Goldbeck Construction Ltd](/assets/63d7baaa29ff2.jpg)
Commercial Construction Project in Stanford Le Hope for Goldbeck Construction Ltd
![Commercial Construction Project in Stanford Le Hope for Goldbeck Construction Ltd](/assets/63d7baaa2a24a.jpg)
Commercial Construction Project in Stanford Le Hope for Goldbeck Construction Ltd