Construction of new temporary car park.  Later removal after new multi-story completed

COMMERCIAL CONSTRUCTION PROJECT IN CAMBRIDGE, CAMBRIDGESHIRE FOR GOLDBECK

Project Description


Construction of new temporary car park. Later removal after new multi-story completed


Client: Goldbeck

Start date: April 2025

Completion Date: Phase 1 – June/July 2025 / Phase 2 - 2026

Value £866k
 

Project Details


  • Working with Cadence adjacent to and protecting existing high-pressure gas main
  • Sub-base to temporary permeable car park as drainage blanket
  • Cap with surface dressing
  • Access road with tarmac surfacing
  • Beany kerb drainage discharge to permeable sub-base
  • Membranes and ground reinforcement
  • Temporary light services
  • Stockpiling and bunding of excavated material
  • Removal of car park and reinstatement to original condition after new car park works completed
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Commercial Construction Project in Cambridge, Cambridgeshire for Goldbeck
Commercial Construction Project in Cambridge, Cambridgeshire for Goldbeck
Commercial Construction Project in Cambridge, Cambridgeshire for Goldbeck
Commercial Construction Project in Cambridge, Cambridgeshire for Goldbeck
 
Previous
 
© Copyright AD Bly Construction 2025