This website uses cookies
More information
Wash bay extensions with tank slabs and service trenches

COMMERCIAL CONSTRUCTION PROJECT IN BREAKSPEAR, WHITTLESFORD AND BIRCHANGER FOR STP SOLUTIONS

Project Description


Wash bay extensions with tank slabs and service trenches


Client: STP Solutions

Start date: July 2025

Completion Date: November 2025
Value of all 3 projects: over £500k
 

Project Details


  • Working in live highways depots
  • Mananaging traffic flows and maintaining access for Client
  • Raft foundations
  • Mass fill and pad foundations
  • Reinforcement to foundations and slabs
  • Concrete slabs to silo tanks
  • Slab to wash bay
  • Service trenching though concrete yard with full reinstatement
  • Operating around existing live services
  • Excavation and termporary works for silt tanks
  • Drainage remedials amd diversions
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
STP Solutions – Breakspear, Whittlesford and Birchanger Highway Depots
STP Solutions – Breakspear, Whittlesford and Birchanger Highway Depots
STP Solutions – Breakspear, Whittlesford and Birchanger Highway Depots
STP Solutions – Breakspear, Whittlesford and Birchanger Highway Depots
STP Solutions – Breakspear, Whittlesford and Birchanger Highway Depots
STP Solutions – Breakspear, Whittlesford and Birchanger Highway Depots
 
Previous
 
© Copyright AD Bly Construction 2025