
COMMERCIAL CONSTRUCTION PROJECT IN BOGNOR REGIS, WEST SUSSEX FOR RG GROUP SALTBOX
Project Description
Construction of a new retail park initially consisting of 2 phases constructed simultaneously for developer Landlink. 4no units – Warburton’s distribution warehouse / Aldi supermarket / Starbucks drive through / Greggs drive through. Plus 4no roads and associated infrastructure.
Client: RG Group
Start date: August 2020
Completion Date: June 2021
Project Details
- Cut and engineered fill with GPS guided plant moving circa 25000m3
- Forming flood compensation zone with surrounding bund
- Drainage up to 5m deep
- Pump station with 2no Caisson shafts 3m diameter 9.5m deep
- Pre cast headwall installation into adjacent water course
- Precast concrete attenuation tanks
- Power float warehouse slabs to FM2 finish
- 278 works onto A29 roundabout forming new entrance
- Complete external works package including mixture of block paving, permeable paving, 7500m2 brushed concrete service area, street furniture and extensive ducting infrastructure
- Value £6.0m

DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us

RG Group – Saltbox – Bognor Regis, West Sussex

RG Group – Saltbox – Bognor Regis, West Sussex