Construction of a new multi storey car park (MSCP7) at the North Terminal Gatwick Airport.  Consisting of 3200 spaces over 7 floors.

COMMERCIAL CONSTRUCTION PROJECT AT GATWICK AIRPORT, HORLEY FOR GOLDBECK LTD

Project Description


Construction of a new multi storey car park (MSCP7) at the North Terminal Gatwick Airport. Consisting of 3200 spaces over 7 floors.


Client: Goldbeck Ltd

Start date: April 2023

Completion Date: June 2024

Value £2.65m

 

Project Details


  • Sheet pile retaining walls
  • Cut and fill to site and retained areas of embankments
  • Pile caps and ground beams
  • Casting in anchor plates for steel frame
  • Construction of large capacity substation
  • Extensive SW drainage with large capacity Qmax channels and interceptors
  • Construction of 5no. stair cores and 4no. lift shafts using Sika waterproof Concrete
  • Importing and preparing stone subbases
  • Tarmac surfacing works
  • Using ground modelling to maintain existing levels to Value Engineer the volumes of materials to remove and import to site
  • Ducting for external services and fire alarm systems
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Goldbeck Ltd - Gatwick Airport
Goldbeck Ltd - Gatwick Airport
Goldbeck Ltd - Gatwick Airport
Goldbeck Ltd - Gatwick Airport
 
Previous
 
© Copyright AD Bly Construction 2024