COMMERCIAL CONSTRUCTION PROJECT AT WOODCUT FARM, MAIDSTONE FOR READIE CONSTRUCTION LTD

Construction of 11 warehouse and distribution units

Client: Readie Construction Ltd

Start date: April 2022

Completion Date: October 2022

Value: £3.3m
 
  • Deep drainage with extensive attenuation, including large diameter storage
  • Culverted waterway diversion
  • Pad foundations, reinforced lift pit bases and dock levellers
  • King post retaining walls
  • Working around existing underground mining structures
  • Co-ordination with others to deliver challenging programme
  • Swales and infiltration trenches to manage surface water
  • Borrow pitting to manage earth movements and eliminate disposal offsite
  • Existing HP gas main crossing the site
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Commercial Construction Project at Woodcut Farm, in Maidstone
Commercial Construction Project at Woodcut Farm, in Maidstone
Commercial Construction Project at Woodcut Farm, in Maidstone
Commercial Construction Project at Woodcut Farm, in Maidstone
 
Previous
Next
© Copyright AD Bly Construction 2024