COMMERCIAL CONSTRUCTION PROJECT AT WOODCUT FARM, MAIDSTONE FOR READIE CONSTRUCTION LTD
Construction of 11 warehouse and distribution units
Client: Readie Construction Ltd
Start date: April 2022
Completion Date: October 2022
Value: £3.3m
Client: Readie Construction Ltd
Start date: April 2022
Completion Date: October 2022
Value: £3.3m
- Deep drainage with extensive attenuation, including large diameter storage
- Culverted waterway diversion
- Pad foundations, reinforced lift pit bases and dock levellers
- King post retaining walls
- Working around existing underground mining structures
- Co-ordination with others to deliver challenging programme
- Swales and infiltration trenches to manage surface water
- Borrow pitting to manage earth movements and eliminate disposal offsite
- Existing HP gas main crossing the site
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
Commercial Construction Project at Woodcut Farm, in Maidstone
Commercial Construction Project at Woodcut Farm, in Maidstone