COMMERCIAL CONSTRUCTION PROJECT AT RINGWAY INFRASTRUCTURE SERVICES, SPOONER ROW DEPOT, FOR STP SOLUTIONS LIMITED
Client: STP Solutions Limited
Start date: June 2022
Completion Date: November 2022
Value £0.8m
Start date: June 2022
Completion Date: November 2022
Value £0.8m
Project Description
Construction of new salt storage facilities. retaining walls and plant bases
- Reinforced bases and ground beams to new salt barn
- Multiple plant and storage bases
- Underground services including working adjacent to existing facilities
- Constructing Maxum Stone retaining wall
- Extensive earthworks to prepare for retaining walls including dealing non-hazardous waste
- Concrete slabs to external yards and internal sheds
- Working within live highway depot meeting all requirements of Client, Ringway
- Surface water drainage with oil separators and land drainage
- Linear drainage channels, connected to existing live sewers
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited