This website uses cookies
More information
Construction of new salt storage facilities. retaining walls and plant bases

COMMERCIAL CONSTRUCTION PROJECT AT RINGWAY INFRASTRUCTURE SERVICES, SPOONER ROW DEPOT, FOR STP SOLUTIONS LIMITED

Client: STP Solutions Limited

Start date: June 2022

Completion Date: November 2022

Value £0.8m
 

Project Description


Construction of new salt storage facilities. retaining walls and plant bases

  • Reinforced bases and ground beams to new salt barn
  • Multiple plant and storage bases
  • Underground services including working adjacent to existing facilities
  • Constructing Maxum Stone retaining wall
  • Extensive earthworks to prepare for retaining walls including dealing non-hazardous waste
  • Concrete slabs to external yards and internal sheds
  • Working within live highway depot meeting all requirements of Client, Ringway
  • Surface water drainage with oil separators and land drainage
  • Linear drainage channels, connected to existing live sewers
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited
 
Previous
Next
© Copyright AD Bly Construction 2024