![Construction of new salt storage facilities. retaining walls and plant bases Construction of new salt storage facilities. retaining walls and plant bases](/assets/631b089d5e988.jpg)
COMMERCIAL CONSTRUCTION PROJECT AT RINGWAY INFRASTRUCTURE SERVICES, SPOONER ROW DEPOT, FOR STP SOLUTIONS LIMITED
Client: STP Solutions Limited
Start date: June 2022
Completion Date: November 2022
Value £0.8m
Start date: June 2022
Completion Date: November 2022
Value £0.8m
Project Description
Construction of new salt storage facilities. retaining walls and plant bases
- Reinforced bases and ground beams to new salt barn
- Multiple plant and storage bases
- Underground services including working adjacent to existing facilities
- Constructing Maxum Stone retaining wall
- Extensive earthworks to prepare for retaining walls including dealing non-hazardous waste
- Concrete slabs to external yards and internal sheds
- Working within live highway depot meeting all requirements of Client, Ringway
- Surface water drainage with oil separators and land drainage
- Linear drainage channels, connected to existing live sewers
![PDF Download](https://adbly.co.uk/images/download.png)
DOWNLOAD THIS PAGE AS A PDF
Download
TALK TO US ABOUT YOUR NEXT PROJECT
Contact Us
![Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited](/assets/631b089d6344b.jpg)
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited
![Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited](/assets/631b089d63b61.jpg)
Commercial Construction Project at Ringway Infrastructure Services, Spooner Row Depot, for STP Solutions Limited