This website uses cookies
More information
Construction of 438 space Multi-Storey Car Park

COMMERCIAL CONSTRUCTION PROJECT AT LIDL, BELVEDERE FOR HUBER PARKING UK

Project Description


Construction of 438 space Multi-Storey Car Park.


Client: Huber Parking UK

Start date: September 2024

Completion Date: March 2025

Value £750k
 

Project Details


  • GPS controlled cut and fill and oversite grading
  • Split level piles mats
  • Precast concrete piling
  • Reinforced pile caps and ground beams
  • Large diameter off site SW drainage connection
  • Land drainage
  • 3 x PCC stair cores
  • Substructure waterproofing and waterproof concrete
  • In-situ concrete walls
  • Block paved car park construction
PDF Download
DOWNLOAD THIS
PAGE AS A PDF
TALK TO US ABOUT YOUR NEXT PROJECT
Commercial Construction Project at LIDL, Belvedere for Huber Parking UK
Commercial Construction Project at LIDL, Belvedere for Huber Parking UK
Commercial Construction Project at LIDL, Belvedere for Huber Parking UK
Commercial Construction Project at LIDL, Belvedere for Huber Parking UK
Commercial Construction Project at LIDL, Belvedere for Huber Parking UK
Commercial Construction Project at LIDL, Belvedere for Huber Parking UK
 
Previous
 
© Copyright AD Bly Construction 2024